The honest 2026 number: $15–$30 per square foot installed. A typical 400 sqft patio lands $6,000–$12,000; premium travertine with borders and seat walls runs $20,000+. Arizona's expansive soils make this a job where the invisible layers earn their money.

Where the money goes

ComponentShare of the job
Excavation, base rock & compaction30–40%
Paver / travertine material25–35%
Laying, cutting & pattern labor20–30%
Edge restraint, sand & finish5–10%

The barefoot test: in July, concrete hits 140°+, concrete pavers slightly less, and travertine stays walkable. If the patio is between the back door and a pool, the travertine premium is a comfort feature you'll use daily for decades.

Material comparison

  • Poured concrete ($8–$14/sqft): cheapest day one; cracks with soil movement, repairs read as patches, holds heat.
  • Concrete pavers ($15–$25/sqft): the workhorse — flexes with soil, piece-by-piece repairs, huge style range.
  • Travertine ($22–$30+/sqft): coolest underfoot, natural stone luxury, strongest resale signal.

Next steps

Most patios here are phase one of a bigger plan — see the shade structure guide and outdoor kitchen guide for what usually lands on top. Then get a free estimate from a licensed provider in your area.

Get a free estimate from a licensed Arizona contractor

Describe the yard and the vision — hear back within one business day.

Free Estimate
Questions

Frequently asked

Base prep. The pavers are the visible 30% of the job — excavation depth, base rock, compaction passes, and edge restraint are where quotes genuinely differ. A patio on 2 inches of skipped base looks identical to one on 6 inches of compacted base — for about three summers.

Broom-finish concrete runs $8–$14/sqft but cracks (Arizona soil moves) and holds heat. Concrete pavers at $15–$25 flex with the soil and repair by the piece. Travertine at $22–$30+ stays remarkably cool underfoot — the desert's barefoot-test winner — and reads luxury forever.

Flatwork alone usually doesn't need one; attached shade structures, gas lines, and electrical almost always do. Good contractors handle the permit question in the first conversation — it's a cheap credibility test of your bidders.

A typical 400–600 sqft patio runs 3–6 working days: demo and excavation, base and compaction, laying, cutting, and sand-set finish. Weather rarely interferes here — crews just start at dawn in summer.